Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 17 results ...

Barraza, G A, Back, W E and Mata, F (2004) Probabilistic Forecasting of Project Performance Using Stochastic S Curves. Journal of Construction Engineering and Management, 130(01), 25–32.

Bonnal, P, Gourc, D and Lacoste, G (2004) Where Do We Stand with Fuzzy Project Scheduling?. Journal of Construction Engineering and Management, 130(01), 114–23.

Chan, A P C, Scott, D and Chan, A P L (2004) Factors Affecting the Success of a Construction Project. Journal of Construction Engineering and Management, 130(01), 153–5.

Cho, Y, Haas, C T, Sreenivasan, S V and Liapi, K (2004) Position Error Modeling for Automated Construction Manipulators. Journal of Construction Engineering and Management, 130(01), 50–58.

Deng, X, Ding, S and Tian, Q (2004) Reasons underlying a mandatory high penalty construction contract bonding system. Journal of Construction Engineering and Management, 130(01), 67–74.

Dikmen, I and Birgonul, M T (2004) Neural Network Model to Support International Market Entry Decisions. Journal of Construction Engineering and Management, 130(01), 59–66.

Dzeng, R J, Wang, W C and Tserng, H P (2004) Module-Based Construction Schedule Administration for Public Infrastructure Agencies. Journal of Construction Engineering and Management, 130(01), 5–14.

Elazouni, A M and Gab-Allah, A A (2004) Finance-Based Scheduling of Construction Projects Using Integer Programming. Journal of Construction Engineering and Management, 130(01), 15–24.

Ford, D N, Anderson, S D, Damron, A J, de Las Casas, R, Gokmen, N and Kuennen, S T (2004) Managing Constructibility Reviews to Reduce Highway Project Durations. Journal of Construction Engineering and Management, 130(01), 33–42.

Goodrum, P M and Haas, C T (2004) Long-Term Impact of Equipment Technology on Labor Productivity in the U.S. Construction Industry at the Activity Level. Journal of Construction Engineering and Management, 130(01), 124–33.

Hauck, A J, Walker, D H T, Hampson, K D and Peters, R J (2004) Project Alliancing at National Museum of Australia—Collaborative Process. Journal of Construction Engineering and Management, 130(01), 143–52.

Ho, S P and Liu, L Y (2004) Analytical Model for Analyzing Construction Claims and Opportunistic Bidding. Journal of Construction Engineering and Management, 130(01), 94–104.

Ling, F Y Y, Chan, S L, Chong, E and Ee, L P (2004) Predicting Performance of Design-Build and Design-Bid-Build Projects. Journal of Construction Engineering and Management, 130(01), 75–83.

Marzouk, M and Moselhi, O (2004) Multiobjective Optimization of Earthmoving Operations. Journal of Construction Engineering and Management, 130(01), 105–13.

Shapira, A (2004) Work Inputs and Related Economic Aspects of Multitier Shoring Towers. Journal of Construction Engineering and Management, 130(01), 134–42.

Shr, J and Chen, W T (2004) Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects. Journal of Construction Engineering and Management, 130(01), 84–93.

Treloar, G J, Love, P E D and Crawford, R H (2004) Hybrid Life-Cycle Inventory for Road Construction and Use. Journal of Construction Engineering and Management, 130(01), 43–49.